INNOCI

Innoci Product Installation Guide: Standardized Process to Support Efficient Delivery

26-08-17

A standardized installation process is a key step to ensuring the long-term stable operation of Innoci products. This guide is aimed at interior designers, building material distributors, and professional installation teams, systematically introducing the standardized installation points of Innoci's main products to help projects be delivered efficiently and with high quality.


General Installation Preparation


- Confirm that the product model and specifications match the design drawings.

- Check whether the positions of water and electrical pipelines meet the requirements.

- Prepare original factory accessories and professional installation tools.

- Carefully read the product installation manual before construction.


Key Points for Toilet Installation


- For floor-standing toilets, ensure the floor is level and use the original sealing ring and fixing screws. Wall-mounted toilets must have a securely installed bracket, and usage is allowed only after passing the load-bearing test.


Key Points for Bathroom Cabinet Installation


- Floating bathroom cabinets should be fixed to solid walls using expansion screws, and the installation height is recommended to be adjusted according to the user's height. Ensure the cabinet is level and the door opens and closes smoothly.


Key Points for Shower System Installation


- Ensure the concealed valve body is embedded in the correct position, and the panel fits seamlessly with the wall after installation. Adjust the shower arm height according to user habits, generally recommended at 2.0-2.2 meters.


Key Points for Hardware Installation


- All screw fixing points should use expansion plugs to prevent loosening. After installation, check the flexibility of switches and sealing.


Key Points for Smart Product Installation


- Ensure power and signal cables are routed separately, and the waterproof rating meets the requirements. After installation, perform functionality tests and system pairing.


Installation Completion Checklist


- Water supply test shows no leakage.

- All switches operate smoothly.

- Smart functions respond normally.

- Appearance is clean and undamaged.

- Installation records and warranty cards are retained.


Innoci provides professional installation training courses and technical support services. It is recommended that installation teams conduct sample installation drills before formal construction to ensure they are proficient in key points.


Standardized installation not only fully maximizes product performance but also significantly reduces future maintenance costs and improves customer satisfaction. Innoci is always committed to working with partners to create high-quality bathroom spaces.